What your site needs

Placement and access

Level ground and a clear vehicle approach path are required. Confirm turning radius and overhead clearance before delivery day.

Electrical and water

Units need a dedicated 20-amp electrical circuit, or a generator if you lack one. Water comes from a garden hose hookup or onboard holding tank.

Freeze protection and servicing

Winter deployments need freeze protection. Confirm generator compatibility and the mid-event pumping schedule with your coordinator.

Delivery to removal

How a placement runs

Each deployment follows the same sequence: delivery, setup inspection, and post-event removal.

01

Delivery

We confirm access, grade, and utility connections, then position the trailer or trailers.

02

Setup inspection

We check power, water, levelling, and amenities before the trailer goes into service.

03

Removal

After the event, we pump, clean, and collect the trailer on the agreed schedule.